Project |
End-User / Year |
SP84 Nicoresti pumping station rehabilitation |
Min. of Agriculture and Rural Dev. (2009) |
Fire signaling and warning equipment (network of 12 addressable stations FO connected) at ARPECHIM Pitesti |
IMSAT-ARPECHIM Pitesti (2009-2010) |
SCADA system and equipment delivery |
SC BOCCARDO Cluj (2007) |
Control and monitoring equipment for gas co-generative power plants Bacau, Gura Humorului, Campulung Moldovenesc and Rădăuţi |
LOIAL IMPEX (2006-2007) |
Monitoring control and dispatcher system for the heating system of Bucharest Municipality |
RADET-(1999-2007) |
Systems and Equipments at CHE- Movileni
- generator diagnosis systems (vibration, partial discharges, etc.)
- low currents installations (anti-burglary, access control, TVCI, phone, radio) |
Energomontaj HIDROELECTRICA- (2007-2010) |
Electric equipment for the modernization of tramway depots, Bucuresti Militari and Alexandria |
GENERAL SERVICE GRUP –RAPB Bucuresti (2004-2006) |
Specific CAD services for the electric installations documentation |
CNE Cernavoda Romania (2004-2005 |
Dedicated studies and specific projects for the “PESCARUS” oil drilling platform |
* PETROSTAR Ploiesti, Romania (2003-2005)
* PETROCONST(2006) |
Turn-key delivery services in the domain of automation for the SCADA-DCS equipment for turbo-generators TA 5 and TA 6 – CET HALANGA |
GENERAL TURBO Bucharest Romania(2002 –2004) |
Automation project for a gas plant - extension (specific devices in the process zone, a distributed control system components selection a.o..)
|
NAOC (Nigerian Agip Oil Company) - Gas Plant OBIAFU / OBRIKOM, Niger (2002-2003) - Project manager: PETROSTAR Ploesti, Romania |
SAD - Data acquisition system for oil storage plants |
Tasbulat - Kazahstan (2002 |
Technological process and safety system modernization for EOCEN - gas field at the offshore oil drilling platform PFCP
|
SNP PETROM - PETROMAR Constanta - Romania (2000 - 2002) |
Monitoring equipment for meteo and hydro parameters in the Cris River Basin |
Romanian Water National Company - RWNC Oradea - Romania (2000) |
Automatic Systems for waste water treatment plant with PLC's SIEMENS |
RAJA - Constanta waste water treatment plant "Constanta South" - Romania (2000-2002) |
Automatic system for de-dusting systems and dust processing of kilns no. 6 and 7 and cement mill no. 10 with PLC's SIEMENS |
CIMENTUL Turda - Romania (2000) |
Control / monitoring systems for various processes with YOKOGAWA, HONEYWELL, PLC - SIEMENS, ABB Advant 500 / AC 410 equipments |
ARPECHIM Pitesti - Romania (1996-2002 |
Automatic system for water pumping stations with PLC's (MOELLER) and computers network (COMPAQ)
|
RGAB -Grozavesti water pumping station (1998) and RAJAC - Iasi water pumping stations "Cerna" and "Octav Bancila" - Romania (1999) |
Automatic systems for process parameter supervision and control at sintering furnaces with conveyer belts
|
SINTEROM SA Cluj - Romania (1995 - 2001) |
| Tele-measuring and tele-control technology modernization of power supply stations for urban traffic transport network |
RATUC Cluj - Romania (2001) |
| Security installations (anti-burglary, area protection, protection to fire noxious emissions, automatic extinguish, access control, ICTV) for banks, office buildings, warehouses, commercial areas, residential properties. |
More than 200 bank quarters of the networks BCR, Reiffeisen Bank, CEC Bank, Commercial Complex Doraly, (1991-2010) |
| Electrical equipment for low currents (voice-data, phone, CATV) for office buildings, banking units, company headquarters. |
8 county headquarters for the Min. of Public Finances, headquarters modernization at IPA, STRAERO,SIAT (1991-2010) |
| Motor oil proportioning device |
National Petroleum Society - SNP PETROM: PECO Dolj (1998), PECO Teleorman (1999), PECO Brasov, Constanta and Targu Jiu (2000-2001) - Romania |